Paper Title : A study of power availability in Oleh community in Isoko South local Government area of Delta state, Nigeria
Author Name : S.O. Otuagoma
Abstract :

In this study, the availability of electric power supply in the Oleh community of Isoko South Local Government Area of Delta State, Nigeria was carried out. The methods employed in achieving this include the use of Hour – Meter to register the number of hours supply was available for a period of three months, Multimeter and Ammeter were used to measure the supply voltage and current at any given time. The load shedding method adopted in the community by the Benin Electricity Distribution Company, BEDC, was also investigated. The results showed that power availability in the community for the three months under review was very bad. The average percentage of power available for the three months was 11.8%, meaning 88.2% of the time, power was unavailable. The power reliability index for each month of the study was negative; -5.94, -7.82 and -5.94 for June, July and August, 2015 respectively against a recommended value of high reliability of 0.989. This poor power availability accounts for the underdevelopment of the community.

Keywords : Electric power, Voltage, Hour-meter, Load shedding and Reliability.
Cite this article : S.O. Otuagoma, " A study of power availability in Oleh community in Isoko South local Government area of Delta state, Nigeria " , International Journal of Advanced Computer Research (IJACR), Volume-6, Issue-23, March-2016 ,pp.47-57.DOI:10.19101/IJACR.2016.623027
References :
[1]https://odinakadotnet.wordpress.com/. Accessed 09 May 2013.
[2]www.unido.org/fileadmin/user_media_upgrade/what_we_do/Topics/Energy_access/WSHPDR_2013_Executive_summary.pdf. Accessed 20 June 2014.
[3]Isoun, T. T. Address by the Honourable Minister, Federal Ministry of Science and Technology at the Inauguration of the UNIDO Regional Centre for Small Hydropower, Abuja, Nigeria. Small Hydropower for Productive Use in Rural Areas.2006.
[4]http://www.gtz.de/de/dokumente/gtz2010-en-HERA-EUEI-PDF-framework-conditions-hydropower.pdf. Accessed 19 March 2013.
[5]Ogujor EA, Orobor NP. SAIDI minimization through conventional energy resources: opportunities and challenges. Journal of Economics and Engineering. 2010:54-6.
[Google Scholar]
[6]Hazra J, Sinha AK. Congestion management using multi objective particle swarm optimization. IEEE Transactions on Power Systems. 2007;22(4):1726-34.
[Crossref] [Google Scholar]
[7]Rai S, Kumar Y, Agnihotri G. Under voltage load shedding for contingency analysis to optimize power loss and voltage stability margin. Electrical and Electronics Engineering: An International Journal. 2014; 3(4); 57-64.
[Crossref]
[8]Bevrani H, Tikdari AG, Hiyama T. Power system load shedding: key issues and new perspectives. International Journal of Computer, Electrical, Automation, Control and Information Engineering. 2010;4 (5): 886-91.
[Google Scholar]
[9]Rekha A, Kumar RM, Ashok KN,Vanitha D. An intelligent load shedding to improve power system congestion. International Journal of Current Research. 2013;5 (4); 973-7.
[10]Chinwuko CE, Chukwuneke JL, Okolie PC, Dara EJ. Modelling and optimization of electricity distribution planning system using dynamic programming techniques: a case of power holding company of nigeria (PHCN). International Journal of Multidisciplinary Sciences and Engineering. 3(6); 39-46.
[11]Dickinson WH. Report on Reliability Survey of Industrial Plants, Part l-Reliability of Electrical Equipment. In IEEE I & CPS conference record. l973.
[Google Scholar]